 |
 The great room features approximately 2000 sq. feet of pillar free, carpeted and sound dampened space!
25 Rooms Plus Common Areas
Main Facility:
- Approximately 10,000 sq, feet overall
- Three levels of approximately 3,300 sq. feet each
- 4 entrance / exits
- DND construction specification, generally carpet & tile over concrete & steel flooring, exterior wood & brick cladding, 10" concrete walls
- High quality electrical power infrastructure in place
- Electrical / mechanical / septic systems designed to support a work environment for at least fifty people
- All facility electrical systems logged and verified in 2001
- Well maintained oil furnace, new twin 1100 litre oil tanks
- Complete upgrade of entire facility and add-on development by DND in 1987
Main Facility Spaces Include:
- Boardroom
- 7 Offices
- Great room (approx. 2000 sq. feet)
- Kitchen
- Bathrooms x 5
- Storage areas x 4
- Utility room
- Electrical room
- Furnace and oil room x 2
Utility Building:
- 600 sq. feet
- Brick & concrete
- Formerly used to house generator for essential services back up power in the event of a power failure
- Back up power infrastructure in place except for a generator
Zoning:
- HRM P5 - Telecommunications & special use
Road Frontage
- 1000 feet of straight road frontage on Highway 349 with excellent ingress and egress
Entry:
- Via 16 foot double swinging chain link gate off Highway 349
Fencing:
- 4000 lineal feet of commercial grade, 7 foot chain link, high security fencing
- Completely surrounds and contains the 23 acres
- Very well installed and in good repair
Septic:
- Septic field in place, designed to support fifty people working daily in the main facility
Parking:
- Existing paved parking for 50 + vehicles around the facility
- Existing unpaved parking areas for 40 + vehicles
- Five outdoor overhead lamp standards illuminate main parking areas
Paving:
- Driveway plus upper and lower parking lots
Lawns:
- 23,000 sq. feet of well maintained grass surrounding main facility
Heating:
- Generally hot water baseboard
- All rooms separately zoned with thermostat control
Electrical:
- Main electrical room set up to provide "essential and non essential service"
Air handling Systems:
- Five separate systems controlling heat, humidity, air quality
|
 |